Naden Mill
The former rubber works was located at Blackpits Road, Norden. The Former works had been vacant for sometime and subsequently fallen into a dangerous condition. Asbestos removal and environmental works were undertaken prior to the demolition works.
The works included the installation of a temporary bailey bridge, to assist plant to cross the site safely, excavators filled with heavy shearing attachments to demolish the buildings, removal of contaminated hotspots, crushing of suitable materials to a classification, and forming piling platforms. These works were carried out within the contract duration of 16 weeks.